Production scheduling software that knows your real capacity

Know which order is going to be late, before it is late.

ProductionPlanning.ai builds a production schedule that fits the machines, shifts and people you actually have, and shows every order at risk.

Your data stays yours. Export or delete it any time. No card to try the demo.

Click a machine to take it offline and watch the schedule move.

This week on the machine shop floor

Order 1045 late by 1 day
  • On time
  • Late
  • Changeover

On time

83%

Bottleneck

82%

CNC Mill 2

Material shortages

2

02The problem

What production scheduling looks like without it

Most small plants plan production in a spreadsheet, on a whiteboard, or in the head of one person. It works until something changes, and on a shop floor something changes every day.

The spreadsheet is rebuilt by hand after every breakdown

A machine goes down at ten in the morning and the plan for the rest of the week is wrong. Someone spends the afternoon moving rows around, and by the time the new version is ready, the floor has already improvised its own.

The promised date was a guess

Sales asks when an order can ship and the answer comes from memory. Nobody checked whether the mill that order needs is already full on Wednesday, so the date is optimistic, and the customer hears about it on the day it was due.

The bottleneck is found after the order is already late

The one machine every job passes through is overloaded for days before anyone sees it. The first signal is a late shipment, when it is too late to add a shift, split a batch or move work to another machine.

03What changes

Production scheduling software built around capacity

Three things change on the first day the schedule knows what your plant can actually do.

1MondayShift 1

A schedule that fits real capacity

Every operation is placed on a specific work center, inside the shifts that work center runs, with the setup time it really takes. If a mill can do 16 hours a day, the schedule never asks it for 20.

2WednesdayShift 2

Every late order visible days ahead

When the schedule is built, each order gets a projected finish time next to its due date. An order that will miss is marked in red with the number of days, while there is still time to change the sequence, add overtime or call the customer.

3ThursdayShift 1

The plan lives in the company, not in one file

The schedule sits in one shared place. The planner, the shift lead, the plant manager and sales look at the same version, and it keeps working when the person who built the spreadsheet is on holiday or leaves.

04How it works

How production planning and scheduling works, in four steps

From a list of open orders to a sequence on every machine, without a six month ERP project.

1

1. Enter orders and routings

Enter open orders in the app: product, quantity, due date, priority. On the Plant plan and above, import them from a spreadsheet or your ERP export instead. Add the routing for each product, meaning which work centers it passes through and how many minutes each operation takes per unit.

2

2. Set shifts and work centers

List your machines and work cells, the shifts each one runs, planned downtime and holidays, and the setup time when a work center switches from one product family to another.

3

3. Run the schedule

The scheduler places every operation with finite capacity, earliest due date first. You see the Gantt chart, the late orders and the bottleneck in one view. On the Plant plan and above you also pick the sequencing rule (shortest operation first or customer priority) and see the material shortages in the same view.

4

4. Send it to the floor

When a machine goes down, you reschedule the rest of the week in one click instead of one afternoon, and the new sequence goes out to the floor. On the Plant plan and above, each work center gets its own queue for the shift, and operators mark jobs started and done.

05Demo

Schedule a real week, right here

This is the scheduling engine, running in your browser. Load a plant, change the orders or the shifts, switch off a machine, and watch the schedule recalculate. Nothing to install and no account needed to run it.

Load a plant

Orders

OrderProductQuantityDuePriorityRemove

Capacity

Shifts per day
Working days per week
Work centers on

Sequencing rule

On time

83%

Late orders

2

Bottleneck

CNC Mill 2

Utilisation

82%

Material shortages

2

Machine shop

  • On time
  • Late
  • Changeover
  • Off

Late orders

OrderProductDueDays late

Material shortages

MaterialNeeded for orderNeeded byShort
Work centerUtilisationLoad

You have seen your late orders and your bottleneck. Keep them.

Save this schedule to come back to it, or run the same engine on your own orders, work centers and shifts.

Three plants ready to load in the demo

Each plant loads with its work centers, shifts, routings, open orders and materials on hand. Change any of them and run the schedule again.

Machine shop

Two shifts of eight hours, five working days, earliest due date first.

  • CNC Mill 1
  • CNC Mill 2
  • Lathe
  • Deburr
  • Paint
  • Assembly

Products, orders and routings are the twelve orders and four products of the worked example below: Bracket, Shaft, Housing and Flange. Setup is 30 minutes on the mills and the lathe when the product changes, and 20 minutes on the paint line.

Materials on hand: 150 housing blanks.

Bakery

One night shift from 22:00 to 06:00 and one day shift from 06:00 to 14:00, six working days, dispatch time first. Quantities are in batches, and every order is due at its dispatch time tomorrow.

  • Mixer 1
  • Divider
  • Proofer
  • Oven 1
  • Oven 2
  • Cooler
  • Packing
ProductRouting, minutes per batch
White loafMixer 1 (15), Divider (10), Proofer (60), Oven 1 (35), Cooler (60), Packing (15)
Seeded rollsMixer 1 (15), Divider (15), Proofer (50), Oven 1 (20), Cooler (40), Packing (20)
SourdoughMixer 1 (20), Divider (12), Proofer (180), Oven 2 (45), Cooler (90), Packing (15)
Rye breadMixer 1 (18), Divider (10), Proofer (90), Oven 2 (50), Cooler (90), Packing (15)
OrderProductQuantityDuePriority
2001White loaf304:00Normal
2002Seeded rolls204:00Normal
2003Sourdough207:00Rush
2004Rye bread208:00Normal
2005White loaf206:00Normal
2006Seeded rolls210:00Normal
2007Sourdough110:00Normal
2008Rye bread112:00Normal

Changeover: 30 minutes of cleaning on Mixer 1 after seeded rolls, because of sesame, and 10 minutes between other recipes.

Materials on hand: 40 kg of rye flour against 15 kg per batch of rye bread.

Metal fabrication

Two shifts of eight hours, five working days, earliest due date first. Quantities are in parts.

  • Laser
  • Press brake
  • Welding bay 1
  • Welding bay 2
  • Paint line
  • Assembly
ProductRouting, minutes per part
Machine guardLaser (4), Press brake (6), Welding bay 1 (18), Paint line (5), Assembly (10)
Cabinet enclosureLaser (8), Press brake (12), Welding bay 2 (25), Paint line (8), Assembly (20)
Base frameLaser (6), Welding bay 1 (35), Paint line (10)
Railing panelLaser (5), Press brake (4), Welding bay 2 (22), Paint line (6)
OrderProductQuantityDuePriority
3001Machine guard20TuesdayNormal
3002Cabinet enclosure30WednesdayRush
3003Base frame12WednesdayNormal
3004Railing panel25ThursdayNormal
3005Machine guard15ThursdayNormal
3006Cabinet enclosure25FridayNormal
3007Base frame10FridayNormal
3008Railing panel20FridayNormal

Changeover: 20 minutes on the laser when sheet thickness changes, 15 minutes on the press brake when the tooling changes, and 45 minutes on the paint line for a colour change.

Materials on hand: 40 sheets of 3 mm steel against one sheet per cabinet enclosure.

06Compare

Production scheduling tools compared, by category

Four ways small and mid sized plants plan production today. We compare categories, not named products.

Spreadsheet or whiteboard MRP or inventory suite Enterprise APS ProductionPlanning.ai
Knows machine capacityNo, cells hold whatever you typeUsually a list of tasks, not finite capacityYesYes, finite capacity per work center and shift
Reschedules after a breakdownBy hand, row by rowPartly, often by handYes, after tuningYes, the rest of the week in one click
Shows material shortagesOnly if someone checksYes, this is its core jobYesYes, per order and per date (Plant plan and above)
Time to first usable scheduleAlready in use, but always out of dateWeeks to months of setupMonths, with a consultantDays, from your existing order list
Needs a consultantNoOften for setupUsuallyNo
07Worked example

A production schedule example: twelve orders, six work centers

One week in a small machine shop, computed by the same scheduling engine as the demo above. Two shifts of eight hours, five working days, earliest due date first, 30 minutes of setup on the mills and the lathe when the product changes, 20 minutes on the paint line.

What goes in

OrderProductQuantityDuePriority
1041Bracket120TuesdayNormal
1042Housing50TuesdayRush
1043Shaft60TuesdayNormal
1044Flange80TuesdayNormal
1045Housing70WednesdayNormal
1047Shaft70WednesdayNormal
1048Housing45WednesdayRush
1046Bracket90ThursdayNormal
1049Flange120ThursdayNormal
1050Bracket100FridayNormal
1051Housing65FridayNormal
1052Shaft50FridayNormal
ProductRouting, minutes per unit
BracketCNC Mill 1 (6), Deburr (2), Paint (2)
ShaftLathe (7), Deburr (2), Assembly (3)
HousingCNC Mill 2 (13), Deburr (3), Paint (3), Assembly (5)
FlangeLathe (5), CNC Mill 2 (4), Deburr (2)

What comes out

  • 10 of 12 orders on time, 83 percent.
  • Order 1045 finishes Thursday, one working day after its Wednesday due date.
  • Order 1051 finishes Monday of the next week, one working day after its Friday due date.
  • Bottleneck: CNC Mill 2, loaded 82 percent of the week, with four changeovers between housings and flanges plus the first setup of the week, 150 minutes of setup in total.
  • Every other work center stays under 51 percent, so the fix is on CNC Mill 2, not across the plant.
  • With 150 housing blanks on hand against 230 needed, order 1045 is short 15 blanks when it starts late on Tuesday, and order 1051 is short 65 on Thursday morning.

What a planner does with that on Monday morning

Both late orders are housings, and both wait for the same machine. That tells the planner exactly where to act: add a third shift on CNC Mill 2, move the flange work to another machine, or agree a new date with one customer, then run the schedule again and check the result before promising anything. The housing blanks get ordered today, not on Tuesday night. The spreadsheet would have shown none of this until Thursday.

Try the demo
08For the plant owner

For the person who signs the invoice

You do not need to read a Gantt chart to see what changes. When the schedule knows capacity, a few expensive things stop happening.

  • Late deliveries are found days in advance, while there is still time to act, instead of on the day the truck was due.
  • Fewer stoppages waiting for material, because on the Plant plan and above shortages are listed per order and per date before the job reaches the machine.
  • The bottleneck machine is scheduled first and kept busy, because it sets the output of the whole plant.
  • Planning knowledge stays in the company when the planner is away or leaves, because the rules, routings and shifts live in the system, not in one file.
  • Your planner gets back the hours each week that now go into rebuilding the spreadsheet.

What larger plants and groups need, included

  • Single sign on with your company identity provider
  • Roles and permissions per plant and per team
  • A service level agreement on the Enterprise plan
  • A security review and questionnaire answered for your IT team
  • A data processing agreement
  • Invoicing with payment terms and purchase orders
Email sales
09Pricing

Production scheduling software pricing, per plant

Every plan is a subscription per plant, billed monthly or yearly. Unlimited users on every plan. Paying yearly costs ten months instead of twelve.

Line

149 USDper plant per month 1,490 USDper plant per year

For one line, or a small plant moving off a spreadsheet.

  • Up to 10 work centers and 500 open orders
  • Finite capacity schedule and Gantt chart
  • Shift calendar
  • Unlimited users
  • Email support

Plant

Recommended

429 USDper plant per month 4,290 USDper plant per year

For a full shop floor with a planner.

  • Everything in Line, with unlimited work centers and orders
  • Material shortages per order and date
  • Shop floor status for operators
  • Changeovers and grouping of similar jobs
  • Sequencing rules
  • Plan versions and side by side comparison
  • Demand forecasting
  • Import from spreadsheets and export to ERP
  • Change history

Group

1,290 USDper month 12,900 USDper year

For a group of up to five plants.

  • Everything in Plant, for five plants
  • Multi plant view
  • Move orders between plants
  • API access
  • Single sign on (SSO)
  • Roles and permissions
  • Priority support

Enterprise

Talk to sales

For larger groups with corporate requirements.

  • Unlimited plants
  • SSO with SAML and SCIM provisioning
  • Granular roles
  • Service level agreement
  • Security review
  • Data processing agreement
  • Invoicing with payment terms and purchase orders
  • Dedicated onboarding lead
Email sales

See the full production scheduling software pricing with every feature by plan.

10Questions

Questions plant managers ask before they start

How long until I have a usable schedule?
Days, not months: with an open order list and rough operation times, the first finite capacity schedule runs the same day.
Do I have to replace my ERP?
No, ProductionPlanning.ai sits next to your ERP, which keeps doing accounting, purchasing and inventory.
What if my routings and times are not accurate?
Start with the times your people use today, and on the Plant plan and above correct them as planned and actual times come back from the floor.
Does it handle changeovers and setup times?
Yes, setup time per work center and product family is counted on the Gantt chart.
What happens when a machine goes down mid shift?
Mark it as down and reschedule, and the orders that now miss their date are flagged straight away.
Can the floor see the schedule?
Yes, on the Plant plan and above every work center has its own queue for the shift.
Who owns my data and can I export it?
You do, and you can export or delete it at any time.
Is there a free version?
No free plan, but the demo above runs the real engine free and without an account.
How does per plant pricing count?
One plant is one site with its own shop floor, and users are unlimited on every plan.
Can we get an invoice and a purchase order?
Yes, on the Group and Enterprise plans.

Full answers to these and more are on the production planning FAQ page.

Read the FAQ
11Start

Know which order is going to be late, before it is late.

Build your first finite capacity schedule on your own orders this week.

Your data stays yours. Export or delete it any time. No card to try the demo.